Objectives
The prime objective of the project was to demonstrate that an optopyrotechnics system can be realized for satellites with available technologies and that the identified benefits can be achieved.
Challenges
- At TRL 4-5, optopyro has relatively low maturity as compared to existing system. However, no significant technological show-stoppers have been identified.
- Compatibility with Non-Explosive Actuators
- Prime challenge is for optopyro to offer a significantly lower price to the Customer for pyro systems
Plan

During the first phase KDA and Airbus established the high level requirements and the system architecture, and conducted a technology trade-off between optopyrotechnics and “conventional” electro-pyrotechnics. During the second phase, KDA breadboarded the chosen architecture, reassessed the technology trade-off, and established the technology roadmap.
Current Status
Project activities are completed.