Objectives
Challenges
Integrating satellite non-terrestrial (NTN) and terrestrial (TN) networks enables ubiquitous network access, requiring 5G user equipment (UE), such as handheld devices or vehicle devices, to connect to both networks directly. In this scenario, UEs may need to perform handovers between TN and NTN networks. Optimizing the number of handovers and the success rate of switching between networks is critical to minimize service interruption. Conventionally, handover can be triggered by signal strength measurements, location information, and other parameters such as elevation angle, Timing Advance (TA) values or Doppler values exceeding a predefined threshold. However, the handover decision is also impacted by the high mobility of UEs and satellites, strict Quality of Service (QoS) requirements such as reliability and latency, and the Quality of Experience (QoE) in terms of UE service satisfaction. Additionally, the different architecture between the NTN and TN networks, the changing communication environment, and the end-user requirements may lead the conventional handover to make late/early decisions and switch to the wrong network/cell. For this, ML-aided handover decisions can be a solution for the TN-NTN integrated network to deal with the network’s partial information, uncertainty, rapidly changing environment, and strict time constraints.
System Architecture
The SHINE project focuses on 5G-based handover between different 5G-networks, from which at least one is a satellite-based NTN. Considering the simple case of two 5G-networks, the following scenarios are considered.
Scenario 1: Handover occurs between a TN and an NTN network with certain overlapping coverage over the region of interest.
Scenario 2: Handover occurs between two different NTN networks (operated by different operators), both with complementary coverage.
Plan
ESA SHINE project started in February 2025 and concluded in March 2026.
The project is composed of the following main tasks:
- System Scenario Definition
- Finalised Technical Specification
- Selected Technical Baseline
- Verified Detailed Design
- Implementation and Verification Plan
- Verified Deliverable Items and Compliance Statement
- Technology Assessment and Development Plan
Current Status
Ongoing.