OSSI

- Orbital Spectrum Sampler for IoT

STATUS | Ongoing
STATUS DATE | 22/12/2022
ACTIVITY CODE | 3E.004

Objectives

The objectives of the project:

  • Demonstrate satellite-based IoT services in the frequency range 1500-5000 MHz

  • Develop and deploy protype user terminals supporting the demonstrations

  • Support preparatory work in the ITU with studies and results from measurements and IoT trials

Challenges

Some of the key challenges to this project are:

  • Wide bandwidth covering multiple types of frequency usage. This requires the front-end to have a very high dynamic range. 

  • Furthermore, the wide bandwidth reduces component availability and performance

  • Short timeline for submitting studies to WRC-27 preparatory process.

System Architecture

Our proposed experimental IoT system to be used for the end-to-end experiments consists of the following elements:

  • A LEO satellite with IoT SDR payload and other payloads

  • A prototype user ground terminal built around a SDR hardware platform with mobile broadband connectivity for command and control

  • KSATLite compatibility

  • IoT experiment control and spectrum analysis software

  • A cloud server for storage of I/Q data

Plan

Phase 1 (June 2022 – November 2022):

  • Definition of use cases, operational concepts and requirements

  • Definition of requirements for the experiment, satellite and ground segment

  • Identification of requirements for satellite bus.

Phase 2 (December 2022 – May 2026):

  • Experiment, satellite and ground segment preliminary design (December 2022- June 2023)

  • Experiment, satellite and ground segment development and test (June 2023 – December 2023)

  • Embarkation of experiment payloads on host spacecraft and test plan consolidation (December 2023 – September 2024)

  • Experiment Execution (September 2024 – March 2026)

  • Lessons learned, exploitation plans and Final review

There will also be two separate activities happening alongside phase 1 and 2, but outside the scope of this activity:

  • Host Satellite Construction

  • IoT SDR Payload Construction

Current Status

  • Project kick-off June.2022

  • Bids received on host satellite construction

  • IoT SDR Payload design at very mature stage

  • Awaiting approval for proceeding to Phase 2.